Pipeline Infrastructure - High-Pressure Transportation Network

Back To Project Page
  • Client: Kazakhstan Midstream Transport Operator
  • Category: Midstream
  • Start Date: January 18, 2022
  • End Date: June 12, 2025
  • Tag: Pipeline, Compression, Integrity
  • Contract Value: $310,000,000.00 USD
Pipeline Infrastructure - High-Pressure Transportation Network

Project Overview

The Pipeline Infrastructure project supported a high-pressure transportation network connecting production facilities, gathering stations, and downstream processing hubs. ODS Oil and Gas LLP provided engineering coordination, constructability review, integrity planning, and commissioning support.

The route crossed varied terrain and required close alignment between pipeline hydraulics, compressor station design, land access, environmental controls, and long-term inspection requirements. ODS helped the client turn these constraints into a staged delivery plan.

Scope of Work

ODS coordinated engineering and field-readiness activities across routing, materials, welding quality, hydrotesting, SCADA integration, and future integrity management.

Technical Execution

The execution plan was organised into controlled workstreams so engineering, HSE, procurement, commissioning, and operations readiness moved together instead of becoming disconnected site activities.

  • Reviewed route selection, tie-in philosophy, valve spacing, block valve locations, and access requirements
  • Supported line pipe specification, coating selection, welding procedure qualification, and quality inspection plans
  • Developed hydrotest packs, reinstatement controls, and commissioning readiness checklists
  • Integrated pressure, flow, leak detection, and SCADA requirements into the operating philosophy
  • Prepared baseline integrity records and inspection intervals for long-term pipeline reliability
Pipeline Infrastructure - High-Pressure Transportation Network technical execution

Client Partnership

ODS worked with the client pipeline team, EPC contractor, inspection agencies, and operations representatives to keep field work aligned with the future operating model. The collaboration reduced rework and gave commissioning teams clear acceptance criteria.

Project Results

The network moved into commissioning with complete technical dossiers, verified pressure test records, and a practical integrity management plan. The client gained a transportation asset designed for safe throughput growth, maintainability, and disciplined operating control.